SFS Group Fastening Technology has developed a new Centre Point System for installing flat panels across both steel and aluminium subframes

Building on its well-founded reputation as a manufacturer of cladding support systems and high-performance fasteners, SFS Group Fastening Technology has developed an advance, user-friendly new Centre Point System for installing flat panels across both steel and aluminium subframes

Among the benefits of the patented Centre Point System is the fact that it answers the challenge of accurately positioning the self-drilling, double thread fastener at the exact centre of the hole in the panel, ensuring the avoidance of subsequent damage to the surface through thermal movement.

It also prevents the environmental risk of plastic waste polluting the site by employing a biodegradable, pre-fitted centring sleeve, which will not constrict the space around the shaft with any residue.

Being made available through SFS stockists nationwide, in a selection of clamping lengths to suit different panel thicknesses, the well-engineered fixing can double the rate of progress and is designed to negate the problem of façades being disfigured, sometimes within just months of completion.

Having been made available in Europe last year with a standard centring sleeve, the new SDA4 and SX4 fasteners have already been appraised for compatibility by a number of leading OEMs, as well as major installers across the UK industry and are being recognised within ETAs.

Andrew Stolworthy, director of product and market development for SFS, comments: “Centre Point solves a variety of issues in a single, simple-to-fit development; avoiding the risk of misalignment or having to utilise a separate, expensive centring device for predrilling the hole in the sub-structure member, which takes time.

“Otherwise, once the building is handed over, the expansion and contraction that occurs across the panel and within the subframe will lead to cracks or potting if the movement is not correctly accommodated.

Balancing sustainability with efficiency

“With Centre Point, the sleeve is ejected from the hole as the installer tightens the fixing and will then biodegrade in line with accepted scientific guidance. The shaft, furthermore, features a double-thread, which avoids it being pulled over to one side, and then there is a thread-free zone to prevent it unwinding and working loose due to vibration.”

In fact, the sleeves, given the designation CS11/4, are produced from biopolymers and other materials which science recognises as being biodegradable under DIN EN ISO 14855, while also meeting limits on heavy metals and other hazardous substances set out under EN13432.2000.

In normal soil and under moderate climate conditions, all traces of the sleeve will be subject to full decomposition by microorganisms during the lifetime of the building.

Both the SDA4 and SX4 ranges, for steel and aluminium subframes respectively, are available in four different sizes to suit panel thicknesses of 6mm, 8mm, 10mm and 12mm-13mm, with corresponding variations in clamping length.

Centre Point will be available from early in Q3 in a full selection of RAL colours on a lead time of just five working days: well within the six to eight-week period typical for the panels themselves.

For further information, call 0330 0555888 or visit www.uk.sfs.com

*Please note that this is a commercial profile. 

The post SFS Centre Point System launched to enhance accuracy, appearance and the environment appeared first on Planning, Building & Construction Today.

Leave a Reply

Your email address will not be published. Required fields are marked *

SFS Centre Point System launched to enhance accuracy, appearance and the environment
Close Search Window