
The introduction of Digital Waste Tracking will change how waste movements are recorded and reported across the UK
The programme is intended to replace fragmented and paper-based reporting with a more consistent digital system. Its stated aims include improving transparency, reducing waste crime, and creating a clearer record of waste as it moves through the sector.
Implementation is expected to take place in phases. Under the current implementation timetable, mandatory reporting is due to begin in October 2026 for permitted waste receiving sites in England and Wales. Scotland is expected to follow from January 2027.
One final note: Digital Waste Tracking does not immediately replace all existing waste documentation on day one. Existing documentation requirements continue during the transition period.
Who will be affected first?
The first phase focuses on waste received at permitted facilities. Waste carriers, brokers, and dealers are not included in the initial mandatory rollout.
A later phase is expected to extend mandatory requirements to carriers, brokers, and dealers. The current draft timetable places this second phase in autumn 2027, although organisations should continue to check official guidance as the programme develops.
This phased approach means the immediate impact will vary across the sector. Receiving sites will need to prepare first, while other organisations should establish when their responsibilities are likely to begin.
Preparing existing systems and processes
Affected businesses will need to consider how waste information is currently captured, checked, and transferred between operational and reporting systems.
The Digital Waste Tracking service is expected to support connections with third-party software through application programming interfaces, commonly known as APIs. This would allow software providers to connect their systems with the government service rather than requiring businesses to manage reporting entirely through a separate process.
Software providers, including Re-flow Field Management, are developing integrations intended to support the first phase of Digital Waste Tracking. Re-flow says it is working on an integration designed to help affected customers meet the proposed requirements through existing workflows. Development, testing, and validation are ongoing.
The precise implications will depend on each organisation’s role, current systems, and reporting responsibilities. Businesses may need to review:
- Which sites and waste movements fall within the first phase
- Where the required information is currently recorded
- Whether existing software will connect with the Digital Waste Tracking service
- Whether processes or system configurations will need to change
- Who will be responsible for checking and submitting records

What should operators do now?
Organisations that receive, transport, broker, or deal in waste should first establish which implementation phase is relevant to them. Those operating permitted receiving sites are likely to face the earliest mandatory requirements under the timetable described in the draft.
They should also speak to their software providers about planned support, likely configuration requirements, and the information that may need to be captured differently. Detailed preparations should be based on confirmed government guidance rather than proposed dates or assumptions about later phases.
Digital Waste Tracking represents a substantial change in waste reporting. Early preparation should help operators identify gaps in their records, systems, and responsibilities before mandatory reporting begins.
To learn more about Re-flow Field Management, visit their website.
The post Digital Waste Tracking update: what you need to know appeared first on Planning, Building & Construction Today.