Morgan Sindall Construction’s Southern Home Counties business has completed a £2.8m project to upgrade critical heating, ventilation and air conditioning (HVAC) infrastructure serving the MRI suite at Worthing Hospital

Appointed by University Hospitals Sussex NHS Foundation Trust through the Pagabo framework, Morgan Sindall delivered the full design and construction of a new dedicated air handling unit (AHU) and associated plant to support the hospital’s MRI and radiology services.

Upgrading critical hospital infrastructure

The scheme included a new air handling unit, replacement MRI chiller, reconfiguration of the Intervention Unit’s chiller plant, a new humidifier and two new chillers.

Major plant equipment was craned onto the hospital roof, alongside the installation of new ductwork, pipework, building controls and local air conditioning units.

The upgraded infrastructure provides improved environmental control and operational reliability, helping to reduce equipment downtime and the risk of postponed appointments.

Further works included a new Bauder inverted roof system, upgraded ceilings and HVAC systems across the MRI scanner room, staff offices, entrance lobby, corridor and cannulation area, as well as improved roof access lighting and bird-proofing measures.

Delivering works in a live hospital environment

Working within a live hospital environment presented significant logistical challenges. Close collaboration with the Trust ensured the works were carefully coordinated to minimise disruption to essential hospital services.

LtR on Morgan Sindall project team image: Matas Kaniusus (asst QS), Tim Jackson (design manager), Nicci Rendell (snr document controller), Tom Bowcock (managing QS), Joe Cornwall (project lead), James Ramsden (snr project manager), Kevin Murphy (snr building services manager), Charlie Culver (site manager), Oleksandr Filippov (asst site manager) & Koyes Ahmed (handyman & traffic marshal).

The project team included EXI Group as MEP design consultants, HOP Consulting as structural engineers, Crowthers Associate Architects, Paine Manwaring as mechanical and electrical contractors, and MRI specialists M&O Group.

Sustainability and social value

Sustainability was a key consideration, with 99% of project waste diverted from landfill. Existing DX air conditioning units were also reused where feasible to reduce embodied carbon, alongside the installation of new energy-efficient MEP systems.

Social value initiatives included two work placements and two site visits in partnership with Northbrook College, volunteering hours and engagement with local supply chain partners Paine Manwaring, Owen Scaffolding and DM&C ASH.

Guy Hannell, area director for Morgan Sindall Construction in the Southern Home Counties, said: “What an achievement it is to hand over these exceptional upgraded facilities to Worthing Hospital. Our team has worked closely with University Hospitals Sussex NHS Foundation Trust to carefully plan every stage so we can deliver these essential infrastructure improvements with minimal disruption to patients and staff, something that can certainly be a challenge when working in and around critical diagnostic services like MRI.”

“With the works now complete, this project will create a far more resilient and reliable environment for imaging services at Worthing Hospital, helping to reduce downtime and support better patient outcomes for many years to come. It’s just fantastic to be part of that.”

James Millar, deputy director of capital development and property at University Hospitals Sussex NHS Foundation Trust, said: “This project represents an important investment in the resilience and future sustainability of our diagnostic services at Worthing Hospital. By upgrading critical infrastructure serving the MRI suite, we are supporting the Trust’s vision of providing Excellent Care Everywhere by ensuring patients have access to reliable, high quality diagnostic facilities when they need them most.

“The successful delivery of this scheme within a live hospital environment is a testament to the dedication of everyone involved. I would also like to thank the Capital Development and Property team and their partnership working with Radiology, Estates and Facilities, the wider hospital site team, and Morgan Sindall Construction for their work on this project. Through careful planning and close collaboration, we were able to complete these essential works while minimising disruption to patients and clinical services. We are grateful to everyone involved for their commitment and professionalism throughout the project.”

The post Morgan Sindall completes £2.8m HVAC upgrade at Worthing Hospital’s MRI suite appeared first on Planning, Building & Construction Today.